DHM Excavating was privileged to be involved with the fast-paced project known as Amblebrook Great Lawn located within the Amblebrook Gettysburg 55+ Active Adult Community.
We broke ground on June 16th, 2022, with the understanding that we had 4 months to complete our scope of work. We were responsible for erosion and sedimentation controls, removing topsoil and mass grading, the pool excavation and backfilling, much of the underground utility work, fine grading, placing stone for under concrete, walking trail installation, and the topsoil replacement. The seeding, landscaping, and hardscaping was not part of our scope of work on this project.
Even though paving was going down on October 19th about exactly 4 months from our start, this job was not without its challenges. Access was extremely limited due to existing phases that were already completed and in operation. Also, it required much coordination between various other trades and other sub-contractors due to limited space and everyone having an extremely compressed schedule.