DHM was contracted to haul 15,000 tons of #8 stone from SGI to Waste Management’s Upton Landfill over a period of several months in 2022

Utilizing our fleet of 40 dump trucks allowed us to haul this stone to the landfill within the required time frame. DHM acted as a communication intermediary between Waste Management and SGI during this time to ensure that an adequate amount of stone was being hauled in so that the project could continue working without any hindrances.

DHM truck drivers also communicated with jobsite management at Upton Landfill as often as necessary to verify that stone was being dumped in the correct place on site. Truck drivers were instructed to haul into the jobsite and leave the jobsite in a quick and efficient manner, without hindering any of the site operations being conducted by the other contractors.